Holly Springs Road Widening (Flint Point-Sunset)

Transportation Bond-Funded ProjectHolly Springs Road Widening


Widening Holly Springs Road from Flint Point Lane to Sunset Lake Road to four lanes with bike lanes and sidewalks. 

This project will increase road capacity ahead of the 540 interchange planned on Holly Springs Road. 

Upgrading the bridge over Middle Creek will improve public safety since the existing bridge floods during heavy rainfall.

Project Maps

Location:

Holly Springs Road from Flint Point Lane to Sunset Lake Road. (See map.)Holly Springs Road

Dec. 3, 2020 Virtual Public Meeting

Completed

Survey work, traffic study, hydraulics design, roadway alignment & virtual public meeting (March 2020)

Under Way

  • Environmental impact study & permitting
  • Design for bridge, for utilities, and for signals and fiber

Project Status Bar graphic

Estimated construction start:

Mid-2021

Next Steps: 

  • Fall 2020: Right of way acquisition

Key Partners:

NCDOT, Capital Area Metropolitan Organization, Duke Energy, U.S. Army Corps of Engineers, N.C. Division of Environmental Quality

More Information:

This project joins an already funded project to widen Holly Springs Road from Main Street to Flint Point Lane.

Also, the Town is seeking additional funding for a project to widen Holly Springs Road from N.C. 55 to Main Street.

Contact:

Utilities and Infrastructure Services: (919) 577-3150

Last Updated:

December 2020