Disclaimer

The map and plans depicted herein are for information purposes only. Information provided on this site and linked websites owned and/or operated by the Town of Holly Springs have been compiled from the best readily available sources, do not serve or constitute as a survey, and should not be construed as such. The town in no way recommends or supports any business that may be associated with the design, construction or presentation of the map and plans found herein. The Town of Holly Springs hereby makes no warranties, expressed or implied, for the data provided and assumes no liability for errors arising from the misuse of the map or plans, their scale or their interpretation.

I agree to this disclaimer. Opens in new window

More information

Project Status

ProposedApplication is received by the Town, is in review, and may be approved or denied.
ApprovedApplication is approved by Town and is pending construction drawing approval / building permits.
In DesignFor town road or infrastructure projects, this designation means the project is being designed (in the conceptual, preliminary or final design phase), undergoing right-of-way acquisition or permitting, or being advertised for bid.
Under ConstructionUnder construction.

While viewing the map, if you know the project number, click on the search icon in the upper left corner (it looks like the magnifying glass), and type it in to view information. Click here for a project key.