Avent Ferry Road Right Turn Lane at Cass Holt RoadAdding a right turn lane from Avent Ferry Road onto Cass Holt Road
Avent Ferry Road Widening Phase 1 Completing widening of Avent Ferry Road from NC 55 to Ralph Stevens Road (formerly Piney Grove Wilbon Road)

Town staff secured federal grant funding for design, right-of-way acquisition, and construction for 80 percent of projected costs.

The design includes a continuous green T-intersection, which allows vehicles on Avent Ferry Road to travel continuously from the bypass toward Ralph Stevens Road (formerly Piney Grove Wilbon Road) without stopping at the shopping center signal. Vehicles from the shopping center could turn left at the signal into a dedicated travel lane on Avent Ferry Road without disrupting the continuous flow of traffic from the bypass. Click here for more information on continuous green T-intersections.

Avent Ferry Road Widening Phase 2 Widening Avent Ferry Road from Ralph Stevens Road (formerly Piney Grove Wilbon Road) to Cass Holt Road.

Although Avent Ferry is a state-maintained road, the town has agreed to administer design, right-of-way acquisition and construction in order to begin construction more quickly. NCDOT will provide 100 percent of project funding, estimated at $8 million.

Ballentine Traffic Signal Installing a traffic signal at the intersection of South Main and Ballentine streets
Bypass Connection at Sportsmanship Way Connecting NC 55 with Sportsmanship way by adding a left turn lane on NC 55 for vehicles turning onto Sportsmanship Way and a signalized U-turn north of Sportsmanship Way
Crosswalk Safety Improvements Adding flashing beacons at eight crosswalks to improve crosswalk safety by alerting motorists to pedestrians on crosswalks
Holly Springs Road Widening from Main Street to Flint Point LaneWidening Holly Springs Road from Main Street to Flint Point Lane, constructing a consistent four-lane median divided roadway with 5-foot sidewalks. Construction is anticipated to begin in 2020.
Main Street Sidewalk North Building a sidewalk along Main Street, connecting the Oak Hall neighborhood and Ting Park
New Hill Road Sidewalk Creating a pedestrian connection between existing sidewalk at the shopping center and proposed and existing subdivision sidewalks
Sunset Lake Road Sidewalk Connecting the existing sidewalks south of Wescott and north of Optimist Farm Road. Project will add about 530 linear feet of new sidewalk on the north side of Sunset Lake Road between Wescott Ridge Drive and Optimist Farm Road. The signal at the intersection of Sunset Lake Road and Optimist Farm Road will be upgraded to allow for a new pedestrian crossing, as well. Construction expected to begin in Spring 2019.
Town Hall Commons Utilities and Infrastructure Improvements Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines.

Click here for more information about downtown development.

Utley Creek Greenway Constructing a greenway to connect existing greenways in east and west Holly Springs by using an existing pedestrian tunnel under NC 55

Water and Sewer Projects

Project Name

Description

Apex Meter Vault Replacement
Replacing an inoperable meter to allow an accurate account of water usage from a neighboring town
Avent Ferry Force Main 
Replacing sewer line to provide additional system capacity and increase pump station efficiency
East Regional Pump Station
Construction of pump station to provide needed capacity
School Days Lane Waterline 
Constructing a new water line to improve system performance and emergency water connections with other towns
Sugg Farm Utilities Improvements 
Widening and replacing road, installing water and sewer lines and a dumping station
Town Hall Commons Utilities and Infrastructure Improvements 
Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines. Click here for more information about downtown development. 
Utley Creek Force Main Repair 
Replacing existing pipes to extend the life of the lines
Wastewater Treatment Plant Phase 2 Manhole RepairRepairing a corroded manhole and piping

Stormwater Projects

Project Name

Description

Dutch Hill Road Stormdrain RepairRepairing a stormdrain pipe that collapsed, causing a sinkhole. The project was bid with the Gable Ridge and Lake Edge Drive projects, and construction is anticipated to begin in fall 2018.
Estes Stream Bank Repair 
Repairing two locations where erosion has occurred on a stream bank
Gable Ridge Culvert Replacement 
Replacing an existing pipe that is failing due to corrosion
Lake Edge Drive Drainage UpsizingImprove roadway drainage by upsizing stormdrains and adding catch basins for faster removal of runoff from the roadway. The project was bid with the Gable Ridge and Dutch Hill projects, and construction is anticipated to begin in fall 2018.
Sugg Farm Utilities Improvements 
Widening and replacing road, installing water and sewer lines and a dumping station
Town Hall Commons Utilities and Infrastructure Improvements 
Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines. Click here for more information about downtown development. 

Other Projects

Project Name

Description

Carl Dean Greenway Exercise Equipment Placement Placing exercise equipment along the Carl Dean Greenway
Cemetery Upgrade 
Constructing a road, building storm drain upgrades, and creating a level grassed area to increase usable cemetery area
Methodist Church Parking Lot Phase 2  
Extending the existing parking lot and adding 32 parking spaces